Production Planning

MPS / MRP SAP

Configure and optimize production planning in SAP PP. Reduce stockouts, optimize work-in-progress and manufacturing lead times through robust MRP and MPS parameters.

Our approach

How we deliver results.

01
MPS — Master Production Scheduling

Long-horizon planning of finished goods. Balancing capacity constraints and sales forecasts to define the master production plan in SAP PP.

MPSSAP PPLong-term
02
MRP — Material Requirements Planning

Cascade calculation of material requirements from the MPS. Generation of purchase proposals and manufacturing orders.

MRPComponentsBOM
03
Capacity Management

Work center capacity analysis, bottleneck identification and load leveling to ensure production plan feasibility.

CapacityBottleneckCRP
04
Master Data & Parameters

Audit and correction of routing times, safety stocks, lot sizes, planning parameters. The foundation of reliable MRP.

Master DataParametersAudit
Fewer stock-outs
Controlled excess inventory
Improved production service
Fewer shop-floor emergencies
What ALICOG delivers

Concrete deliverables.

MRP/MPS Audit — diagnosis of existing parameters, identification of unreliable proposal root causes
Parameter Redesign — safety stocks, lot sizes, planning horizons, MRP strategies
Capacity Management — CRP configuration, bottleneck identification and resolution
Planner Training — MD01/MD02 usage, MRP list reading, exception management
Planning Dashboards — OTIF, stockout rate, inventory turnover KPIs

An MRP audit in
2 to 3 weeks.

We diagnose your SAP PP parameters, identify root causes and rebuild a solid planning foundation.